Informed Decisions - The Key To Your Success
Your
development decisions will determine the future success of your
family entertainment center. As an REC client, you will have a
multitude of development options available to you including turnkey construction.
Our design/build was
developed by me over the course of my involvement in this industry.
It was brought about by the volume of work confronting me and the
need for increased efficiency and industry quality. The
time required for me to meet the demands of designing, estimating,
and managing these time sensitive projects was substantial. As a
specialized consultant, my business was not in a position to expand.
In 1998 I decided to begin finalizing my efforts of the past nine
years into an integrated design/build system. The system would enable
me to perform quality projects with substantially accelerated
schedule. The result was a third party software add-on and
development solution for project management, design, estimating, and
construction management for FEC facilities.
Project
Management Consulting
Project
management begins with your initial decision to open a family
entertainment facility. Not to be confused with construction
management, it is "use management" of different professions
as related to engineering, architecture, general contracting, and
municipal/governmental control. Some areas of the US and abroad will
require extensive engineering, environmental, regulatory, and other
compliance, while others will require little. Knowledgeable
identification and appropriate use of professional resources will
prove essential to the development process.
REC
full service clients are entitled to ongoing/in-house project
management consultation without cost under the terms of their service
agreement. We also provide full service project management and liaison.
Advanced FEC Design
We
combine leading edge cad technology and freehand conceptual ideas to
produce truly exceptional results relative to your budget. Our
methods rely on the appropriate balance of creative concept and
object based CAD technology. Our design modules represent years of
creative reiteration, the secret to superior design. They are
specific to FEC construction and constitute the core of the design
system for easy application, editing, and facility operational
efficiency. Our design focus is in the following areas:
-
Site concept
and master planning
-
Detailed site plans
-
Grading plans
-
lighting plans
-
Landscape planning
-
Cave designs
-
Gunite/shotcrete
rockwork systems
-
Waterscaping systems
-
Volcano designs
-
Double and
single overpass and
underpass
Bridge designs
-
Arcade designs
-
Miscellaneous
structures and details
-
Themeing
Our designs enhance existing landscapes and other features to
provide a comparative advantage for any market. Miniature golf greens
are designed for both fun and championship play beside cascading
waterfalls and through caves on nature theme courses. Trek through
the exotic rhythms of an island adventure to thundering volcanos over
bubbling streams of lava; send your customers on African safari
through a paradise of mysterious sounds and jungle animals. Or create
your own custom theme. Go-kart track designs display overpass and
underpass bridges, super elevated turns, and roller coaster
straightaways that will give your customers the ride of their life.
Innovative arcade designs serve an array of electronic games,
redemption memorabilia, concessions, and pathways to entertainment.
An exciting adventure and audio visual display planned to attract the
entire family.
Detailed Project Estimating
After
your construction plans are complete, your project cost is broken
down into direct and indirect construction cost under division,
subdivision, item and resource. We draw from over 1000 data base
items for material and labor specific to FEC construction . Unlike
traditional CSI division methods, we employ a modular division
concept which works in unison with our design package. This method
gives us a clear picture of what to expect, along with a basis for
development and control monitoring of your construction network
analysis. Your project estimate is based on previously recorded time
requirements for different resources to accomplish each specific
task. The accuracy of estimate depends on timely implementation of
appropriate resources of average quality and similar rate. A budget
is also produced that can be used for tracking cost via Quicken, Quickbooks, or
other popular accounting packages.
Network Analysis & CPM
One
of the biggest problems you
will face during construction will be knowing what activities to
schedule concurrently,
what their duration is, and
having those precise resources available at that time. Your projects
construction process should exhibit a symphony of action by different
trades, as opposed to narrow focus or linear thinking. Your success
in this area will determine if you will open before the beginning of
your peak season, if you suffer significant increase in construction
cost, and if you will pay extended interest on construction loans.
The method of network analysis makes possible the most efficient use
of all construction elements, in unison, to accomplish the quickest
possible path(critical path) through your project. Our network
analysis for FEC's is an adapted form of CPM composed of two major
modules (project management and construction management).
Network
analysis was first researched and developed around the turn of the
century for use in the emerging, complex electrical industry. It
helped forge the computer and giant auto industry through logic and
mass production techniques. In the late 1950's new principals were
developed by Dupont chemical and the US Navy that would bring about
the development of what would be known as CPM (Critical Path Method).
This new technique would allow shut down time, to accommodate new
construction in the chemical refinery sector, to be reduced
dramatically. These techniques were also adopted by the US Navy for
development of its Fleet Ballistic Missile Project (Polaris Project).
The CPM method was born out of these research efforts and later
provided the root theory for the most sophisticated modern generic
project management software. Over the past two decades, the primitive
science of CPM has become scarcely known but remains a powerful tool
by virtue of its adaptability to define any process and its inherent
nature to force the complete breakdown of that process.
The
only drawback to CPM is the time intensive acquisition of field data
that accurately depicts "step by step" activity in its finest
detail. In addition, few people posses the varied construction and
CPM development experience required for such an endeavor. This is a
major obstacle to CPM application for nearly all micro size companies
involved with complex projects or larger companies developing complex
projects with little similarity.
I
first used CPM for project management and engineering in the chemical
industry in 1979. Over the next three years, I found its use would
greatly speed up and refine control of my projects if I had time for
diagram research and development. I would not use CPM again until my
first involvement with FEC projects in 1987. As engineering manager
and design engineer, I had many responsibilities. The time required
for me to collect adequate data for diagram development was too time
consuming. And it would require complete participation through all
project phases. We were forced to continue our traditional methods of
construction management in recreation.
After
going into business in 1989, I provided hands-on design, project
management, and construction management in the field of all crews for
FEC construction. I decided from the beginning to precisely document
every resource, activity duration, dependency, optimum crew size, and
cost for every phase of site development. I literally spent thousands
of hours and a total of nine years in the documentation process while
performing these varied task.
Is
every project the same? No, but a FEC can be broken down into its
greatest number of individual (single man) task that for the most
part will always be the same. These tasks can be modified to
accommodate most FEC projects of this type. As a result, network
diagrams can be prepared in a fraction of the time required for the
pilot diagram. A custom CPM for your particular project will prove to
be an invaluable resource for timely completion, cost and high
quality control.
Popular
Gantt charts (bar charts) are used by us to express the cumulative
result of your network analysis and schedule. They are easily
interpreted by developers and individuals of different background.
Just about anyone can understand a bar chart. Unfortunately, these
charts make excellent marketing tools and have become commonplace as
a means of expressing specific time frame based on general ideas.
Your charts will be fully supported by a detailed custom CPM and
construction estimate.
When we
perform your design and on-site consulting for the duration of your
project, a CPM network document is prepared at no cost to you. This
document is for use by your on-site consultant in preparing your
construction schedule,Gantt chart,and guiding you through the control
monitoring of your project.
On-Site Construction
Management
Consulting And Construction Stakeout.
In
the past, on-site consulting has been a worthwhile proposition for
FEC owners. Even experienced commercial builders armed with
information available in industry need assistance through many areas
of FEC construction. Many times, owners attempt to space out
consulting visits to widely. They find themselves recalling
consultants, suffering setbacks, and increased expense.
With
good management you'll be able to use local trades in many areas,
thereby, reducing the need for imported contractors. You'll solve
local licensing and permitting problems among others. In addition,
the on-going acquisition of competent construction stakeout has been
an area of concern for many developers. Some local stakeout concerns
may be able to handle the construction staking for your project. But
the question is: will they be on your job site when you need them?
Site stakeout for FEC's of this type is intense and will require a
somewhat constant but sporadic use of control. Most stakeout
companies maintain a backlog necessary to their staying in business;
this can present a major stumbling block for your project. When you
choose REC for your consulting needs, you'll have the option of
experienced stakeout control. Your on-site consultant will not only
be experienced in construction management but also, in all phases of
construction layout for FEC's.
At REC
Enterprises we have concentrated our efforts in areas most important
to you. Whether your laying out precise control, placing hundreds of
cubic yards of gunite/shotcrete, installing sophisticated
waterscaping systems, or professionally designed topography, you'll
want our proven know-how to assist you through all phases of your
project construction.
Copyright
© 1999, 2001 James Baughan. All rights reserved Legal Home Top |